Back

HIGHWAY 407 INTERCHANGE

PICKERING, ONTARIO

Download PDF
thumb
thumb
thumb
thumb

GEO-Instruments is proud to have been involved in the design and field portions of an instrumentation and monitoring program employed to measure the magnitude, distribution, and time dependency of drag load on driven steel H-piles for a three-span integral bridge structure at Nash Rd/Black Creek and Hwy 418 (East Durham Link).

 

Our expert team is ready to get started on your project.

Request a Quote